Aquagym Dolbeau

Mandate
Site design and technical support

Customer
Construction Unibec

Year
2018-2019

Aquagym Dolbeau

Surveys, sizing, plans and specifications for the redevelopment of the parking lot to manage stormwater, promote infiltration and limit flow. Corrective work and extension of the sanitary network, management of bio-infiltration islands, definition of the outfall and definition of the stormwater network.

The parking lot is bordered by built-up areas with varying gradients, and was intended to optimize pedestrian and public circulation and harmonize with the built-up area around the town hall.

Aquagym Dolbeau